Government's Programme of Action - 2004
Economic Cluster


Index | Next

ActionsDepartmentsTimeframe Progress - Updated 15 Feb 2005

FIRST ECONOMY

   

1.00

BROAD ECONOMIC STANCE

   
1.01No significant changes to macroeconomic management foreseen.NTOngoingContinuing to use inflation target as an anchor to stabilise the economy
1.02Inflation targeting to remain in placeNTOngoingThe National Treasury and the Reserve Bank have an inflation targeting technical committee that continually reviews options for controlling inflation and monitors inflation developments in the economy
1.03The Executive should work with the monetary authorities to ensure that the objective of a stable and competitive exchange rate and appropriate inflation range is attainedNTOngoingThe committee meets regularly and reports back to the principals
1.04Shift to microeconomic reformsdti, NT, PresidencyOngoingThe Micro Economic Reform Strategy has been reviewed and strengthened.

2.00

INCREASED LEVELS OF INVESTMENT IN PUBLIC INFRASTRUCTURE

   
2.01Develop sector-specific infrastructure investment plansDPE, DME, dti, NT, DOTNov-04Energy and Transport sector investment projects are being prioritised. Specific announcements will be made such as those in the Durban and Cape Town ports
2.02The development of financing strategies to implement plans including Public Private Partnerships and similar mechanismDPE, DME, dti, NT, DOTSep-04Continuing to develop financing options tailored to each division/subsidiary of the SOE for Energy (Eskom) and Transport (Transnet). Announcements will coincide with specific capital market activity within the investment framework announced in Oct-04
2.03Implementation of an appropriate regulatory framework to stimulate new State Owned Enterprise investment in infrastructureDPE, NT, PresidencySep-04The rollout strategy for the Energy, Transport and Telecommunication sectors is in the finalisation process, and will be announced in due course
2.04Strengthening of sector regulatorsDPE, DME, DOCContinuousThe Status report for the Telecommunications, Energy and Transport input sectors has been completed. Ongoing work on the review of the water sector
2.05Strengthening of Government capacity to oversee the State Owned EnterprisesDPE, NT, PresidencyContinuousPhase 1 report was submitted to Cabinet during September for noting. Currently stakeholder consultations are taking place, prior to the submission of a Cabinet Memorandum
2.06Finalise CAPEX financing strategyDPE et alSep-04An outcome of 2.02, which is still in progress.
2.07Finalise Government-wide review of the State Owned Enterprises performance practicesDPE, NT, DPSASep-04Final reports completed. Inter-Ministerial committee to review recommendations
2.08Better utilisation of Public Investment Commission's Isibaya fundNT, GDCNov-04A draft strategy has been discussed with the Minister and is being further improved in the light of this consultation
2.09Expedite Port restructuringDOT, DPEa.s.a.pSee 3.1.9

2.1

INCREASE LEVELS OF INVESTMENT IN THE FIRST ECONOMY

   
2.1.1Finalise discussion with social partners to invest 5% of institutional fundsNT, Presidency, DoL, dtiDec-04Discussions have been finalised with social partners on the principles that will guide the implementation. The financial sector process will further guide the implementation process
2.1.2Existing fora of consultation, including working groups, should be strengthened in the implementation of Growth and Development Summit agreementsPresidency, DoL, dti, NTOngoingUpdated GDS implementation report presented at Joint Working Group meeting in Dec-04, and the Presidency convened technical discussions with labour and business on growth challenges.
2.1.3Announce detailed and enhanced investment plans of State Owned Enterprises, including Development Finance Institutions, to CabinetDP, NTSep-04Outcome of 2.02-still in progress.
2.1.4Road shows to present potential domestic and foreign investors each of the sectors identified within the Micro Economic Reform Strategy (MERS), explaining incentives available to attract investments into these sectors, including advantages offered by IDZdti, NT Export and investment promotion missions for: agro-processing, automotive, capital equipment, chemicals, metals and mining and cultural industries in Europe, Asia, Africa and North America - Customized Sector Programmes being finalised
2.1.5Finalise Enterprise Development Bill to provide a framework for the development, adjudication and streamlined extension of incentives to all enterprises in a transparent mannerdti Research report and the international benchmarking exercise completed in Nov-04. Draft Enterprise Development Bill finalised

3.00

LOWER COST STRUCTURE IN THE ECONOMY AND ENHANCED LEVELS OF COMPETITION

   
3.01Submit to Cabinet a comprehensive logistical strategyDOT, DPE, dtiNov-04Cabinet memo prepared. Draft Green Paper to be presented to Cabinet early in 2005.
3.02Submit to Cabinet a discussion paper on administered prices, policy to be made public in OctoberNTJun-04; Oct-04Second report submitted to Cabinet in Sep-04, and certain steps approved, including establishment of an administered prices index by StatsSA, to be released early in 2005.
3.03Investigate the impact of import parity pricing and general pricing on the development of downstream sectors, with a focus on labour intensive sectorsdtiNov-04A strategy for dealing with import parity pricing in the South African economy is being developed and will be presented to Cabinet
3.04Table progress report on Second National Operator in Cabinet in next three months and finalise urgentlyDoCAug-04 a.s.a.pPotential investors for the majority 26% SNO stake short-listed. Stakeholders discussing and close to signing off on shareholders agreements and business plan with DOC as facilitator. Initial discussions with ICASA on the licensing process.
3.05Accelerate the finalisation of the National Ports Authority BillDOT, DPEa.s.a.pThe NPA Bill went through the Portfolio Committee in Nov-04.
3.06Finalise institutional framework to manage the national water infrastructure within six monthsDWAFNov-04Cabinet approved the National Water Resource Strategy in Sep-04. The Water Agency to be established.

3.1

CONTINUE TO WORK TO REDUCE THE COST OF DOING BUSINESS IN OUR COUNTRY

   
3.1.1First ship dock at Coega/NgquradtiSep-05Land acquisition programme finalised, infrastructure development on track, MoUs with key partners signed, and ISO 14001 certified.
3.1.2Spoornet increase freight capacity by 30% over 5 yearsDOT, DPE200915-year locomotive plan finalised, and infrastructure capital projects have been presented. Financial parameters and PPP options still being developed.
3.1.3220 million investment from the Rail Commuter Corporation for commuter transport and safetyDOTDec-04Due diligence to be carried out to determine the implications of consolidating passenger and commuter rail
3.1.4Registering King Shaka International Airport as Public Private PartnershipsNT, DOTa.s.a.pKing Shaka International Airport has been registered with National Treasury's PPP unit. The feasibility of the project being bid to the private sector for the rest of the activities around the airport has largely met the requirements of the PPP unit.
3.1.5First Regional Electricity Distributor to operateDMEJun-05Draft business case tabled at the board meeting in Jan-05. Eskom completed ring-fencing exercise. Risk mitigation strategy which will include interim Board and seconded MD is being developed
3.1.6All Regional Electricity Distributors operationalDMEJan-07RED boundaries finalized and financial modeling of REDs completed Stakeholder interactions are taking place at various levels. Cooperative Agreements with Municipalities that distributes approximately 70% of electricity have been signed
3.1.7A tender for the provisioning of new generating capacity to provide for the growing energy needs from 2008, will be issued publicly in December and should be awarded during the first half of 2005DMEDec-04; Jun-05Tendering process was launched with the Expression of Interest in Dec-04. The tendering timetable is on the Department of Minerals and Energy website
3.1.8Implement plans announced in the past concerning national transport logistic systemDOTa.s.a.pSee 3.05.
3.1.9Work with parliament to expedite the process of the restructuring of ports to bring in new investment and lower the cost of moving imports and exportsDOTa.s.a.pConsultation on Port Economic Regulator initiated. Implementation Plan completed. Awaiting outcome of NPA Bill

4.00

MANUFACTURING AND SERVICES SECTORS THAT ARE GROWING AND CREATING JOBS, INCREASING VALUE-ADD, MEETING BASIC NEEDS, COMPETING GLOBALLY

   
4.01Enterprise Development Bill to extend enterprise support to new sectors to be submitted to Cabinet within next four monthsdtiSep-04See 2.1.5
4.02Accelerate the development and implementation of support strategies for priority sectorsdti, NT, DEAT The Tourism Global Competitiveness Project outcomes were presented to Cabinet in October. Domestic tourism growth strategy launched at Indaba 2004 and the marketing campaign rolled out in Jun-04, generating R18m revenue from R6m investment

4.1

DO MORE TO IMPROVE OUR EXPORT PERFORMANCE, FOCUSING ON SERVICES AND MANUFACTURED GOODS

   
4.1.1Engage the export sectors to assist them to take full advantage of the possibilities we have to expand access to the EU and the US markets, as a result, respectively, of the SA-EU Trade and Development Agreement and AGOAdti, DOA, DMEOngoingNational export strategy being developed and will be ready by Apr-05. Market access information strategy for EU and USA to be finalised in first quarter of 2005/6 financial year
4.1.2Pay the necessary attention to the earliest possible conclusion of trade agreements with Mercosur, EFTA, the US, India and Chinadti, DFA, Presidency SACU/Mercosur Preferential agreement signed in Brazil in Dec-04; EFTA negotiations may be concluded by Mar-05; USA/SACU not yet converging on non-trade issues; negotiations with China planned for early 2005 and with India in later 2005.

5.00

MORE ENTERPRISES ESPECIALLY BLACK-AND WOMEN-OWNED AND MANAGED

   
5.01Finalise charters in strategic sectors and review sector BEE strategiesdti, NT, DOC, DMEOngoingNegotiations have been finalised, but not yet gazetted as envisaged in the Act, for charters in : Mining, Financial services, Petroleum. Codes of Good Practice published for public comment in Dec-04. Tourism BEE scorecards completed in Dec- 04
5.02Establish BEE Advisory Council to advise on implementation of BEE strategydti, DEATa.s.a.pThe composition of the Council will be finalised during 2005
5.03National Empowerment Fund to announce/introduce new products financial and non-financialdtiAug-04Products launched in May-04.
5.04Re-establish the Agricultural Credit Scheme(ACS) in DOA to provide capital for this sector, leaving the Land Bank to deal with established commercial sector. R1 billion is immediately available to start the ACSDOADec-04Agriculture Credit Scheme (ACS) memo approved by Cabinet as submitted and the business plan approved
5.05Accelerate sectoral initiatives including the comprehensive farmer support programmes and tourism enterprise programmeDOA, DEATOngoingTEF MTEF funding of R37m by DEAT w.e.f Jul-04, including a tourism entrepreneurial training programme. CASP budget o R200m for 2004-05 transferred to provinces for on-and-off farm infrastructure projects
5.06Project team compromised of DoA, DLA and DPLG to be established to coordinate land and agrarian reformDOA, DLA, DPLGOngoingProject team established to coordinate land and agrarian reform.
5.07Bill on cooperatives and implement cooperatives strategydti, DOADec-04Bill approved by Cabinet in Nov 04 for submission to Parliament early in 2005, awaiting certification from state law advisors.
5.08Launch massive communication campaign to inform economic citizens in the second economy about opportunities and available supportGCIS, Economic ClusterOngoingSee 9.12

5.1

PARTICULAR ATTENTION TO FURTHER GROWTH OF THE SMALL AND MEDIUM BUSINESS SECTOR

   
5.1.1Report to Cabinet on SMME support, incl. location of support, operational jurisdiction of Apex, better reporting requirements for companies, possibilities of a business register, a different tax regime aimed at Second Economy entrepreneurial capabilitiesdtiJun-04Stakeholder briefing was held in Dec-04, prior to operationalisation in 2005. SEDA CEO appointed to unite NAMAC and Ntsika. Several initiatives on SMME procurement and tourism support underway.
5.1.2Project team comprised of dti, DME, DPE, NT and DPLG to be established to coordinate support to small and micro enterprisesdti, DME, DPE, NT, DPLGOngoingThe team is established and work is underway
5.1.3Review regulatory framework of SMME, to facilitate its growth and development.dtiSep-05Initial review completed in Aug-04. Further work to quantify SMME burden of VAT, income tax and Regional Services Council levy. Assessment done into the regulatory framework i.r.o tourism SMMEs, including available funding and support instruments.
5.1.4Merge Ntsika and the National Manufacturing Advisory CentresdtiDec-04Ntsika and NAMAC merged in De-4 to form Small Enterprise Development Agency (SEDA)
5.1.5Work with the financial institutions to implement provisions of the Financial Charter as it relates to SMMEdti, NTa.s.a.pProgress in appointment of Council and work proceeding on credit schemes and access strategy
5.1.6Submit to parliament a bill on Cooperatives before the end of the present calendar yeardtiDec-04See 5.07

6.00

A LABOUR FORCE WITH THE SKILLS NEEDED BY THE ECONOMY

   
6.01Establishment of Skills Development Agency would reduce administrative burden on employersDoLOngoingA study to assist SMME’s to recruit and train learners will inform the regulations, guidelines and national rollout of the Employment and Skills Development Agencies to be established throughout the country during 2006.
6.02Labour and Education to consult to market more aggressively learnership programme to recruit more school leavers and graduatesDoL, DoEOngoingA coordination project committee between DOE and DOL has already developed a framework with more focus on scarce skills, and are involving SETAs and FET College in the process
6.03Finalise Immigration regulations to recruit targeted scarce skills in the short termDHA, DoL, dtiAug-04Immigration Amendment Act has passed through both houses of Parliament and given Presidential authorisation in October 04.
6.04Identify and remove barriers that prevent employers from taking on more learnersDoL Target: 80 000 learnerships by Mar-05. 85 000 achieved Dec-04
6.05Adequate funding for technical colleges and align courses with economy needsDoL, DoEApr-05SETA’s FET and HET Institutions have been involved in joint projects relevant to economic sectors. The adjusted NSDF 200-2010 provides a coordination and funding framework that SETAs are to follow to fund these institutions

6.1

SPEED UP THE PROCESS OF SKILLS DEVELOPMENT, FOCUSING ON SHORTFALLS THAT WE HAVE ALREADY IDENTIFIED

   
6.1.1Engage all SETAs to increase uptake of learners beyond the 64000 since Growth and Development Summit and improve the focus on skills in short supply.DoLDec-04Target of 80 000 learners by Mar-05 was exceeded during Oct 2004 and a joint project is underway with DOE on increased focus on scarce skills. The adjusted NSDF 2005-2010, provides a systematic way in which SETAs are to plan and report in this area
6.1.2Establish register of all graduatesDoE, NYCDec-04A register for students who graduated in 2003 is being finalised
6.1.3Ongoing review of educational curriculum relevance to the needs of the economy and cultivating and entrepreneurial cultureDoL, DoE, dti, NT, PresidencyOngoingClusters of SETAs are participating in various committees established by DoE to improve the relevance of FET curriculum to the needs of the economy
6.1.4Departmental representation on SETA's be kept at senior staff levelDoLOngoingDoL SETA re-establishment review process will lead to new certificate and adjusted SETA landscape during 2005
6.1.5Cluster must consider the issue of migrant labour and submit a report on the way forwardEconomic clusterOngoingA Macro-Social report was submitted to the Jan-05 Cabinet Lekgotla.

7.00

INCREASED R&D SPENDING AND THE DIFFUSION OF NEW TECHNOLOGIES

   
7.01Detailed roadmap on system governance back to Cabinet in June 2004DSTJun-04Roadmap endorsed by Cabinet in Oct-04. Implementation to follow.
7.02Increase public sector R&D investment and expand incentives (not necessarily financial) available to the private sector to do the same, in order to meet international benchmarks and align focal areas with national development goalsDSTOngoingThe development of National Biodiversity Strategy and Action Plan, National Action Programme to Combat Desertification and development of Bio-regions is underway. Six new centres of scientific excellence established.
7.03Development of our region as a global hub for astronomy and space science and technologyDSTOngoingSouthern African Large Telescope (SALT) to be completed Mar-05. Square Kilometre Array bid submitted. Concurrency bid for NASA Deep Space Network being finalised
7.04Continue to work on the diffusion of new technologies across the economyDSTOngoingDST submited a policy document to cabinet in Nov-04

8.00

MORE EQUITABLE GEOGRAPHIC SPREAD OF ECONOMIC ACTIVITY

   
8.01Develop a comprehensive economic map of South Africadti, PresidencyOngoingStats SA finalising Spatial Development Indicators
8.02Develop a strategy to promote more equitable geographic spread of economic activity, and develop appropriate support mechanisms to implement the strategydti, Presidency, DPLG, NTOngoingSee 8.01
8.03Resolve political blockages on some Spatial Development Initiativesdti, DEATOngoingOngoing discussions with counterparts in the SADC region to conclude process
8.04Align Integrated Development Plans (IDPs), provincial and national strategies around priority spatial interventions, National Spatial development PerspectivePresidency, DPLG, NTDec-04Project completed. A cabinet memorandum on interventions needed to drive alignment was submitted to Cabinet in Jan-05.
8.05Develop a logistics corridor strategyDOT, DTI, DPE Some Governance and Consultation Structures established. Initial optimisation plan in development process. Certain key projects along corridors commenced

8.1

CROSS-CUTTING PRIORITIES

   
8.1.1Preparations for 2010 Soccer World CupDSR; Presidency, DPW, NT, DOT, DEATOngoingInitial discussion held at the joint meeting of Economic and Social Clusters in Sep-04.

SECOND ECONOMY

   

9.00

DEVELOP AN INTEGRATED CLUSTER STRATEGY TO INTERVENE IN THE SECOND ECONOMY INCORPORATING CURRENTLY UNCOORDINATED EXISTING INITIATIVES INCLUDING THE FOLLOWING

   
9.01Launch Expanded Public Works Programme in all provinces concentrating on the 21 urban and rural nodesDPW, DPLG, DSD, DoH, DEATSep-04EPWP launched in all provinces by September. 12 235 jobs in environment and culture sectors in 1st quarter, and extensive training. Progress by 2nd quarter (not final): R1.5 billion spent ; 1 459 EPWP projects; 76 000 job opportunities.
9.02Finish Financing Protocol for the Urban Renewal and Rural Development NodesDPLG, NT, local & prov. GovtJul-04Jan-05 Cabinet Lekgotla approved recommendations regarding departments' and SOEs future contributions in the nodes. These are being developed for medium term integration into Cluster strategies and funding commitments as part of the Financing Protocol
9.03Operationalise APEX Funddti, PresidencyDec-04Ministerial Briefing of stakeholders took place in Dec 04. Full launch will be considered after the first phase of implementation.
9.04Implement Land Reform for Agricultural Development process and Comprehensive Agricultural Support ProgrammeDOA, DLAOngoingSee 5.05. Development of sub-sector strategies for wine, grain and fruit underway.
9.05Publish AgriBEE for public commentDOAJul-04Stakeholder discussions are continuing, the inputs to be consolidated following the Dec-04 closing date.
9.06Strategy for financial and non-financial support to co-operative enterprisesdtiBy December 2004Incentive guidelines are ready, awaiting departmental approval. Non financial technical support to be piloted in the 2nd quarter of 2005.
9.07Expand Adult Basic Education and Training and align with Expanded Public Works ProgrammeDoE, DPW, DoLa.s.a.pExpanded Public Work Programme (EPWP) alignment plan finalised during December
9.08Community Development Workers deployed in 21 urban and rural nodesDPSA, DPLG, SAMDIBy December 2004Relationship strengthening with stakeholders especially ward councillors in order to accept the services of CDWs.
9.09ICT introduced in nodes for governance and development purposesDPSAa.s.a.pProgress continuing
9.10Implementation of Municipal Infrastructure GrantDPLG, NTOngoing71 project management units established in municipalities. Of the total amount of grants allocated, 80% was disbursed by mid Feb-05
9.11Implementation of broad based BEE strategydti, DPLG, NTa.s.a.pSee 5.02
9.12Launch mass communication campaign to inform economic citizens in the second economy about opportunities and available supportGCIS, Economic ClusterOngoingStarted in Aug-04 and officially launched ion October. 92 workshop days in all provinces, and many additional workshops by NGOs. 120 000 booklets distributed. TV serialisation under discussion with SABC
9.13Develop strategy to promote equitable geographic spread of economic activitydti, DPLG, PresidencyOngoingSee 8.03
9.14Continue Spatial Development InitiativesdtiOngoingSee 8.03
9.15National and Household food securityDOA, DSD, DEATOngoingCotton and livestock strategies completed; wine, grain and fruit under way.
9.16Job opportunities along the entire agricultural value chainDOAOngoingSee 9.15
9.17Increased income from agricultural activitiesDOA See 5.04
9.18Increase support to agriculture in communal areas and other small scale agriculture, drawing on resources of ACSDOAOngoingSee 5.04
9.19Approval of Communal Land Rights Bill will improve the possibilities for better economic utilisation of communal landDLA, DOAOngoingImplementation strategy for Communal Land Rights Act being finalised.
9.20StatsSA and relevant govt agencies to immediately start research on economic activities in Second Economy communities while implementing Cabinet decision on a comprehensive household survey and allocation of addresses to all households -StatsSABefore 2006 if possibleLFS Oct-04 report; Socio-Economic Survey of the Second Economy to be done in 2005 and at 3 year intervals; Consumer survey in 2006; development index being prepared for discussion in Oct-04; census 2006 replacement plan finalised.
     Last updated: 2005 March 7